FORM C.R. E. No. 24.
Kowloon Canton Railway.
BRITISH SECTION.
ESTIMATE.
Main Head: Bridges.
Sub. Head: Minor Bridge No.32.
Work: One 15 ft Arch with passage at ch.747000
Quantity DESCRIPTION Rate Unit AMOUNT 28,600 Excavation in foundations 10/- 286.00 Timbering and Pumping 500.00 5,600 Concrete in foundations 35/- 5,460.00 18,610 Masonry in superstructure 40/- 11,444.00 Masonry in Coping 5,600 Dry stone backing 2/- 720.00 1,400 Masonry in Arches 2/- 2,800.00 10/- 56.00 Total 21,366.00 Contingencies 10% 2,126.60 Grand Total 23,392.60Drawing C.R.E.326°
FOT
on
gowlinЯ motne noolwod
:
7JOY).
D
008
310
00 088
3+
QU 01
SPE
Or
201
MOITO32
HEITIЯa
3TAMIT23
•
FORM C.R. E. No. 24.
Kowloon Canton Railway.
104
BRITISH SECTION.
ESTIMATE.
.
besit nish.
bno duż
Main Head.
Sub. Hend
Work
Bridges.
Minor Bridge No.32.
One 15 ft Arch with passage at ch.747000
Duantity.
DESCRIPTION.
B2
Drawing C.R,E,326°
AMOUNT.
Rute. Unit.
Cts.
vivatnu vi ni nottsva oxË
28,600 Excavation in foundations
10/-
286
en being her zaitedeÄT
Item Timbering and Pumping.
500
:
00
{
5,6 600 Concrete in foundations.
Į
006
35/-
5,460
18,610 Masonry in superstructure.
40
11,444 00
Masonry in Coping.
5,600) Dry stone backing.
1,400 Masonry in Arches.
360
2/-
2,800
2/-
720 00
10/
56 00
8 8 8 8 8 8 8
00
0%
'01 zsianişniinoƆ
LEIGT
Total
Contingincies 10%
21,366 00
2,126 60
Intol baari)
Grand Total
23,392
60